Deprecated: Creation of dynamic property Nelio_AB_Testing::$plugin_slug is deprecated in /home3/mpowers3/public_html/staging-empower-solar/wp-content/plugins/nelio-ab-testing/nelio-ab-testing.php on line 178

Deprecated: Creation of dynamic property Nelio_AB_Testing::$plugin_name_sanitized is deprecated in /home3/mpowers3/public_html/staging-empower-solar/wp-content/plugins/nelio-ab-testing/nelio-ab-testing.php on line 179

Deprecated: Implicit conversion from float 11.5 to int loses precision in /home3/mpowers3/public_html/staging-empower-solar/wp-includes/class-wp-hook.php on line 77

Deprecated: Implicit conversion from float 11.5 to int loses precision in /home3/mpowers3/public_html/staging-empower-solar/wp-includes/class-wp-hook.php on line 79
Freeport Fire Department Goes Solar - EmPower Solar

Freeport Fire Department Goes Solar

Construction of a 50 kilowatt SunPower Photovoltaic system is underway at the Freeport Fire Department, located at 15 Broadway in Freeport, NY, just north of the LIRR station. The EmPower Installation Team started phase 1 of the installation 2 weeks ago and should be completed by the end of October. A typical residential installation takes 3-5 days to complete. This installation is 5 times the size of a large residential PV system. Furthermore, metal rafters (versus wood) and other complexities have added to the amount of time for this installation to be completed.

Freeport received funding for the solar project from a competitive New York State Energy Research and Development Authority (NYSERDA) grant, which originated from a American Recovery and Reinvestment Act (ARRA) stimulus program.

Since the Village of Freeport has its own municipal electric provider, Freeport Electric, and is not in LIPA territory, residents are not eligible for the $1.75/watt solar rebate from LIPA.

EmPower Yourself
with Our Solar Solutions

Get a Solar Estimate Make Appointment