Construction of a 50 kilowatt SunPower Photovoltaic system is underway at the Freeport Fire Department, located at 15 Broadway in Freeport, NY, just north of the LIRR station. The EmPower Installation Team started phase 1 of the installation 2 weeks ago and should be completed by the end of October. A typical residential installation takes 3-5 days to complete. This installation is 5 times the size of a large residential PV system. Furthermore, metal rafters (versus wood) and other complexities have added to the amount of time for this installation to be completed.
Freeport received funding for the solar project from a competitive New York State Energy Research and Development Authority (NYSERDA) grant, which originated from a American Recovery and Reinvestment Act (ARRA) stimulus program.
Since the Village of Freeport has its own municipal electric provider, Freeport Electric, and is not in LIPA territory, residents are not eligible for the $1.75/watt solar rebate from LIPA.
Save up to 30% on day one and say goodbye to rising electric bills
Save up to 30% on day one and say goodbye to rising electric bills
About the Author
EmPower Solar develops, engineers, installs, and services solar and battery systems for residential and commercial clients. Since 2003, EmPower Solar has empowered thousands of New York homeowners and businesses with 47 megawatts of distributed solar. Its vision is to create a new energy paradigm powered by clean, renewable energy for a more prosperous, healthy, and civil world. The company culture is defined by the EmPowering Way, which results in consistent 5-star customer service reviews. For more information visit empower-solar.com.